How do I fill in "Aid Intensity" in the application?
In accordance with the Tender documentation and superior legal regulations, a control formula with preset limits is set up in the application as specified in Chapter 2.3, point (7), Table 1. Each tenderer determines the aid intensity by ticking the correct preferences on the Cost Summary tab in the section "Declaration of the tenderer on the facts affecting the maximum aid intensity". It shall indicate the type of organisation, information on the publication of results and information on any collaboration according to the list offered and in accordance with the rules set out in the Tender Document. This will show the pre-set % ceilings for the level of support from the provider in the Maximum aid intensity column. The share of the project can then be determined by the amount of funds provided from other sources and their allocation to each type of research. (Basic , Industrial and Experimental Development - the calculation has the possibility to adjust the funds only for Industrial and Experimental Research, the funds for Basic Research are automatically calculated by the system in the value of funds from other sources.)