Does the maximum national allocation per project include overhead costs, or are these costs calculated separately from the established limit?

The maximum allocation (e.g., EUR 250,000) includes overhead costs. These are calculated as 25% of total direct costs, i.e., the sum of personnel, operating, and capital costs, excluding contract research.